Doiok Journal A 1956 hanok, rebuilt by hand
The 128-Day Log

Every day, written down.

From the first dumpster on February 9 to the final inspection in June — the unabridged log of our rebuild, translated from the daily record we kept in Korean. Costs in ₩, mistakes included.

Demolition
#01 Emptying a House That Held Seventy Years
February 9, 2026 · Day 1
#02 The Day Demolition Paid Us Back ₩129,490
February 11, 2026 · Day 2
#04 Two Grinders Are Twice as Fast — Rent, Don't Buy
February 20, 2026 · Day 5
Roof & Structure
#03 Grinding Seventy Years Off the Rafters — and Ordering Blueprints for ₩70,000
February 16, 2026 · Day 3
#05 A Slide for Roof Tiles, Invented on the Spot
February 20, 2026 · Day 6
#06 A Quarter of the Roof, Off in Two Hours
February 20, 2026 · Day 7
#10 Extending the Eaves: The Buyeon Go Up
February 26, 2026 · Day 11
#11 Jacking Up Sagging Rafters — and Registering the Business
February 27, 2026 · Day 12
#12 The Buyeon Are Done, and the House Finds Its Silhouette
March 3, 2026 · Day 13
#16 New Gables from New Zealand Pine — and a Race Against the Rain
March 5, 2026 · Day 17
#17 A Miniature Hanok at the Threshold: Building the Gate Bay
March 6, 2026 · Day 18
#18 The Gate Stands — and Two Old Posts Get Relief
March 7, 2026 · Day 19
#19 Why Hanok Joints Hold: A Lesson in Mortise-and-Tenon
March 9, 2026 · Day 20
#20 The Roof Is Bare — and We Rearranged the Whole Floor Plan
March 9, 2026 · Day 21
#22 A Ceiling Collapse, a Deadline, and a Clean Roof
March 13, 2026 · Day 25
#23 Twenty-Five Bundles of Battens: The Roof Gets Its Grid
March 14, 2026 · Day 25
#24 Eighty Percent of a Roof in One Day
March 15, 2026 · Day 26
#25 The Day the House Became a Hanok Again
March 16, 2026 · Day 27
Insulation & Walls
#07 Insulating a Roof That Was Never Meant to Be Insulated
February 24, 2026 · Day 8
#08 The Invisible Work: Sealing Gaps, Sanding Eaves, Reading Regulations
February 25, 2026 · Day 9
#09 From Construction Site to Space
February 25, 2026 · Day 10
#13 The Best Insulation Was There All Along: What the Tile Man Taught Us
March 3, 2026 · Day 14
#14 Granite, Square Stone, Black Tile: Dressing the Courtyard Walls
March 3, 2026 · Day 15
#15 Finding the Finish: Putty, Mesh, and an Acrylic Filler Audition
March 4, 2026 · Day 16
#21 Protecting the Star of the Show: Masking Every Rafter
March 11, 2026 · Day 22
#26 The Old Windows Come Home; the Wall Campaign Begins
March 18, 2026 · Day 28
#27 ₩1.5 Million of Flatness: The Wall Boards Arrive
March 19, 2026 · Day 29
#28 We Glued the First Boards On Upside Down
March 20, 2026 · Day 30
#32 The Compass-Cutting Method (Invented on Site, Day 35)
March 27, 2026 · Day 35
Bath & Plumbing
#29 Bathroom Demolition: Two Burst Pipes and a Masterclass
March 25, 2026 · Day 32
#30 Digging 40cm Down — and Renting X-Ray Vision for ₩6,500
March 25, 2026 · Day 33
#31 A Tub by the Window — and the Day We Cut a Hot-Water Line
March 26, 2026 · Day 34
#33 One Plumber, Eight Hours, ₩800,000 — and Heating We Didn't Know Was Broken
March 30, 2026 · Day 36
#35 We Dug Up Our Own Work: Insulating the Buried Pipes
April 1, 2026 · Day 38
#36 Five Pallets in One Hour: The Great Tile Haul
April 4, 2026 · Day 40
#37 Black Rubber Floors and the Taming of the Main Line
April 6, 2026 · Day 41
#38 A Bathtub Built Like a Wall: Brick by Brick, Laser Level Running
April 7, 2026 · Day 42
#39 Trowel, Mist, Brush: Cracking the Mud-Wall Finish
April 8, 2026 · Day 43
#40 The Ceiling-Plaster Manual, Written in Trial and Error
April 9, 2026 · Day 44
#41 Painting Yourself Out of a Bathtub
April 10, 2026 · Day 45
Interiors
#42 Forty Bags of Liquid Floor: The Leveling Pour
April 11, 2026 · Day 46
#43 The Tub Gets Dressed; the Wires Get Tucked
April 14, 2026 · Day 48
#44 Forty-Five Degrees of Difficulty: The Jolly-Cut Tub Rim
April 15, 2026 · Day 49
#45 Three Carpenters, Three Days, and a House That Refuses Right Angles
April 17, 2026 · Day 50
#46 Dry-Fix Is Not X18: A ₩13,000 Lesson in Material Character
April 20, 2026 · Day 53
#47 Six-Hundred-Millimeter Tiles at Forty-Five Degrees
April 21, 2026 · Day 54
#48 Erasing the Seams: Putty, Mesh Tape, and a Self-Built Wall
April 22, 2026 · Day 55
#49 Four Air Conditioners and a Brick Bench in the Tub
April 23, 2026 · Day 56
#50 Dome Ceilings, Sample Lights, and the Rafters Drink Their Stain
April 24, 2026 · Day 57
#51 Both Bathrooms Tiled — and Epoxy for the Heavy Ones
April 27, 2026 · Day 59
#52 The Day the Lattice Windows Went In
April 28, 2026 · Day 60
#53 The Client's Job Is the Site: Lessons in Serving a Specialist
April 29, 2026 · Day 61
#54 Hiding the Manifold, Skimming the Light Boxes
April 30, 2026 · Day 62
Finishing
#55 The First Brushful of White: Paint Testing Begins
May 1, 2026 · Day 63
#56 Ten Blades and a Rubber Mallet: Grout Day
May 2, 2026 · Day 64
#57 The Masking Tape Heresy: Epoxy Grout, Wiped Not Taped
May 3, 2026 · Day 65
#58 Porcelain Day: Toilets, Basins, and a ₩450,000 Install
May 4, 2026 · Day 66
#59 Hardwood Over Red Clay Paste: The Floor Goes In
May 6, 2026 · Day 68
#60 House Slippers on a Construction Site
May 7, 2026 · Day 69
#61 A Shelf from Scraps, a Lamp That Wouldn't Light
May 8, 2026 · Day 70
#62 A Two-Meter Roller and the Second Coat of White
May 10, 2026 · Day 71
#63 A Baker's Piping Bag Meets a Stone Wall
May 11, 2026 · Day 72
#64 One Brother Down: The Solo Protocol
May 12, 2026 · Day 73
#65 Daiso Wallpaper and a Window Frame from the Scrap Pile
May 13, 2026 · Day 74
#66 Free Bricks, a Box of Bacchus, and the Art of Hiring Strangers
May 14, 2026 · Day 75
#67 Countertops, a Laundry Tower, and a ₩600,000 Rebate
May 15, 2026 · Day 76
#68 The Carpenter Returns: Framing the Traditional Maru
May 18, 2026 · Day 77
#69 The Maru Complete — and a Third Coat Nobody Planned
May 19, 2026 · Day 78
#70 Motion Lights at the Gate, Bonsai Dreams at the Nursery
May 20, 2026 · Day 79
#71 The Boiler Behind the Marble: Hiding Machinery Beautifully
May 21, 2026 · Day 80
#72 Six Cans of White, and a House Cleaned for Its First Guests
May 22, 2026 · Day 81
#73 Guest Zero Reports: Three Nights With Our Own Kids
May 26, 2026 · Day 82
#74 Bookcases, a Budget Smart Screen, and Wi-Fi: The Stay Takes Shape
May 27, 2026 · Day 83
#75 Moving a Dragon's Head for the Neighbors — and Building the Garden's Bones
May 29, 2026 · Day 84
Opening
#76 Day 85: Painting the Courtyard Floor, Closing the Log
June 1, 2026 · Day 85
#77 Soft-Open Notes: Staining the Maru, Silencing the Door
June 5, 2026 · Day 86
#78 Two Missing Rows: Closing the Wall Before the Inspectors Come
June 9, 2026 · Day 87
#79 The Last Gate: Passing the Electrical Safety Inspection
June 16, 2026 · Day 89
Epilogue
#80 Epilogue 1: The Operator's Masterclass
July 3, 2026
#81 Epilogue 2: Stepping Stones, Rain Gutters, and the Gravel We Under-Ordered
July 28, 2026